Establishment of store and its
planning
Whenever we keep some materials with
record systematically in a particular place and using
the same as
per daily requirement we require some planning in a
proper manner is called store keeping with the usage
capacity either in sq. meter/tonnage/cum/Kilo liter
etc.
Therefore if you would like to construct
stores in a hydro sector of different sizes according to
use like spare parts, steel, oil, cement, assorted
miscellaneous materials etc you may write to us
info@hpcs.co.in we will provide detail planning with
illustration to you. Initially we may arrange a demo at
your site in power point if it is desired. Please note
that we do not provide foundation drawings.
Equipment planning for medium size
tunnel
For construction of head race tunnel usage
of equipment various as per geological conditions for
example in class-1 & class-2 rocks types of equipment
changes with class-3 & Class-4 types of rock
i.e. medium to hard type
and decomposed to soft type of rock otherwise your
progress rate will be slow therefore we are confused what
type of equipment should be used when you can not predict
what type of rock is coming across.
Therefore you may be required to change
excavation equipment after 50% excavation works in the
middle way which will be a matter of investments a huge
amount or delay in construction of head race tunnel. We
may provide a correct decision so that you need not to be
changed equipment all of a sudden. Our expert team will
provide correct planning as per rock conditions and with
detail illustration. Therefore incase of any abnormal
situation please Contact to our mail address
info@hpcs.co.in
Maintenance of Plant & equipment
& Cost of repair
It is a well-known fact that our daily
progress suffered mostly due to breakdown of equipment,
as such maintenance of plant & equipment and
allocation of fund for R&M is most important because
if you do not perform the normal periodic maintenance of
equipment the cost of repair shall be higher than the
normal cost. It has been seen in a hydro sector private
developers do not keep stand by equipment or they use
stand by equipment only incase of break down as a support
to run the work.
If you are finding such type of
difficulties to run the equipment in a systematic manner
our extensive package will help you and reduce the repair
cost drastically whatever R&M team you are having or
not. You may contact us to our mail address
info@hpcs.co.in for corrective procedure. We may arrange a
demo in power point if it is desired so.
Ventilation system for head race
tunnel
The ventilation of under ground works is
important when the length of tunnel is more than 500 M.
However ventilation of any types of tunnels either it is
HRT, TRT, desilting chamber, under ground power house etc
ventilation system is must from the beginning of portal
establishment. To calculate the blower HP and air
required at face the fowling parameter must be
known:-
1. No of Diesel equipment and other equipment
working inside the tunnel.
2.
No of persons are working inside the
tunnel.
3.
Area of the tunnel.
4.
Cross section of ventilation
duct.